§ 39.1675 — ELECTRIC INDUSTRY REPORT

UT § 39.1675Title 2. PUBLIC UTILITY REGULATORY ACT · Part B. ELECTRIC UTILITIES · Ch. 39. RESTRUCTURING OF ELECTRIC UTILITY INDUSTRY · Art. D. MARKET STRUCTURE

Statute text

View on source
(a)Not later than January 15 of each odd-numbered year, the commission, in consultation with the independent organization certified under Section 39.151 for the ERCOT power region, shall prepare and submit to the legislature an electric industry report.
(b)Each electric industry report submitted under this section must:
(1)identify existing and potential transmission and distribution constraints and system needs within the ERCOT power region, alternatives for meeting system needs, and recommendations for meeting system needs;
(2)summarize key findings from:
(A)the grid reliability assessment conducted under Section 39.165; and
(B)the report required by Section 39.9112;

Legislative history

Added by Acts 2023, 88th Leg., R.S., Ch. 410 (H.B. 1500), Sec. 24(b), eff. September 1, 2023. Redesignated from Utilities Code, Section 39.166 by Acts 2025, 89th Leg., R.S., Ch. 204 (H.B. 1620), Sec. 22.001(69), eff. September 1, 2025.