California Water Code
§ 12748
WAT § 12748 Effective Jan 1, 2019Div. 6 · Part 6 · Ch. 2 · Art. 3
Statute text
View on leginfo.ca.gov(a)The plan of improvement for flood control and other purposes on the Napa River in Napa County is hereby adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 222, 89th Congress, as adopted and authorized by the Act of Congress approved October 27, 1965 (Public Law 89-298, the “Flood Control Act of 1965”), as modified by data in the General Design Memorandum transmitted December 8, 1970, by the District Engineer, San Francisco District, United States Army Corps of Engineers, to the Director of Water Resources, at an estimated cost to the state of such sum as may be appropriated for state cooperation by the Legislature upon the recommendation and advice of the department. This authorization shall not be deemed to confer preference on this project over the needs of other statewide programs in appropriation of available funds.
(b)(1) The state payments on the Napa River Flood Control Project shall be 75 percent of the costs of lands and rights or interests in lands whereon channel improvements and channel rectifications are located, and of lands, rights, or interests in lands necessary in connection with the construction, operation, or maintenance of those channel improvements or rectifications, including those necessary for flowage purposes, spoil areas, borrow pits, or for access roads, and shall be 90 percent of the costs of the relocation, reconstruction, or replacement of existing improvements, structures, or utilities rendered necessary by the project.
(2)The local agency payments on the Napa River Flood Control Project shall be 25 percent of the costs of lands and rights or interests in lands whereon channel improvements and channel rectifications are located, and of lands, rights, or interests in lands necessary in connection with the construction, operation, or maintenance of such channel improvements or rectifications, including those necessary for flowage purposes, spoil areas, borrow pits or for access roads, and shall be 10 percent of the costs of the relocation, reconstruction, or replacement of existing improvements, structures, or utilities rendered necessary by the project.
…
Legislative history
Amended by Stats. 2018, Ch. 412, Sec. 1. (SB 1073) Effective January 1, 2019.