(a)(1) The commission shall, in an existing or a new proceeding, develop methodologies for allocating electrical system integration resource procurement needs to each load-serving entity, as defined in Section 380, based on the contribution of the load-serving entity’s load and resource portfolio to the electrical system conditions that created the need for the procurement and for determining any costs resulting from a failure of a load-serving entity to satisfy its allocated procurement needs. Those needs and costs shall be limited to those that are subject to the commission’s jurisdiction pursuant to Section 380, 454.51, or 454.52.
(2)The electrical system integration resource procurement needs and costs described in paragraph (1) shall include, but are not limited to, those relating to the following:
(A)Resource adequacy requirements associated with system flexibility, as described in subdivision (c) of Section 380.

Legislative history

Added by Stats. 2019, Ch. 397, Sec. 2. (AB 1584) Effective January 1, 2020.

Source: California Public Utilities Code § 397 from the California Legislative Information (public record). DecisionDepot is for informational use only and is not legal advice — verify against the official source before relying on this text.