California Public Utilities Code
§ 2793
PUC § 2793 Effective Jan 1, 1997Div. 1 · Part 2 · Ch. 6.5
Statute text
View on leginfo.ca.gov(a)Upon receipt from the park or community owner of a deposit representing the gas or electric corporation’s estimated cost of the engineering evaluation, the gas or electric corporation shall, within 90 days, do all of the following:
(1)Develop an engineering plan for bringing the gas or electric system to the standard described in Section 2794, incorporating all relevant documentation including plans, drawings, engineering studies, and other existing documentation provided by the park or community owner, and considering incorporation of all portions of the gas or electric system found to be used, useful, and compatible.
(2)Develop an appraisal of the value to the gas or electric corporation of the physical plant and equipment found to be used, useful, and compatible that comprise the gas or electric system, or both, to be transferred, including an estimate of the remaining useful life of the gas or electric system. The value to the gas or electric corporation shall take into consideration the expenditures by the park or community owner to comply with the criteria established in Section 2794.
…
Legislative history
Added by Stats. 1996, Ch. 424, Sec. 1. Effective January 1, 1997.