THE COURT.
This is a petition by El Dorado Irrigation District for a writ of mandate to compel respondent, its treasurer, to pay a warrant drawn upon the construction fund of the district. Upon the hearing in this matter an order of reference was made and findings of fact were prepared by the referee, Hon. Peter J. Shields, Judge of the superior court. From these findings, the essential undisputed facts appear as follows: Pursuant to section 30 of the California Irrigation Act (2 Deering’s Gen. Laws, 1931, p. 1948, Act 3854), the district employed S. J. Norris, an engineer, to prepare plans for irrigation works. Upon the rendition of his report, the board of directors estimated that the sum of $1,300,000 would be necessary to carry out the project. The report and estimate were submitted to the bond certification commission (now the California districts securities commission), composed of the attorney-general, state engineer and superintendent of banks, as required by section 30a of the Irrigation Act. The commission gave its approval, and on January 20, 1927, the board called a special election at which the bonds were voted. Thereafter $600,000 worth of bonds were sold, the proceeds placed in the construction fund, and the money expended.
On December 20, 1928, a supplemental engineering report was submitted by Norris, approved by the directors and by the bond certification commission. This report made certain changes in the original plan of construction embodied in the first report. Thereafter, an additional issue of $350,000 worth of bonds was sold, and construction was continued under the modified plan. Various expenditures were made and obligations were incurred.
On November 25, 1930, an action wras commenced by Matthew Murray, a taxpayer of the district, on behalf of himself and other taxpayers, to enjoin further construction,
[271]
on the ground that the district had no power to change the plans after the bonds had been voted. This action was subsequently dismissed by the plaintiff and a new action was filed, in which a demurrer was sustained and dismissal entered after failure of the plaintiff to amend.
One of the contracts made by the district in carrying out the modified plan was with the Belton Water Wheel Company. A balance of $403.80 being due under said contract, a claim was presented to and approved by the directors, and a warrant drawn, directing the respondent treasurer to pay the sum. Because of doubts as to the validity of the proceedings, he refused to do so. Because of similar doubts, the general contractor on March 13, 1931, refused to continue performance. There being no litigation then pending by which a speedy determination of the issue could be had, the district sought the remedy by application for mandate to this court. Matthew Murray and John L. Luse, as taxpayers, intervened and filed briefs in opposition to the petition.
More from California Supreme Court
- People v. Wende (1979)
- People v. Watson (1956)
- People v. Superior Court (Romero) (1996)
- People v. Kelly (2006)
- Auto Equity Sales, Inc. v. Superior Court (1962)
- Aguilar v. Atlantic Richfield Co. (2001)
- People v. Lewis (2021)
- In Re Estrada (1965)
- Denham v. Superior Court (1970)
- People v. Marsden (1970)