Creamery Package Manufacturing Co. v. Bennett
Before: Langdon
Synopsis
The facts are stated in the opinion of the court.
[707]
LANGDON, P. J.
This is an appeal by the defendant from a judgment against him in an action for the agreed price of certain machinery and labor to install the same. The action is based upon a written contract which is set out in the complaint. This contract calls for goods to be shipped to Chowchilla Creamery, Chowchilla, California, at a price of $1,775. It also contains an agreement to pay “six dollars per day and traveling, hotel and other reasonable expenses, for an expert machinist to superintend and to assist in the setting of said machinery,” etc. This contract is signed by plaintiff by its agent, and by the defendant. The contract is in a form that opens like a book, and consists of two sheets, or four pages. The first two pages contain the stipulations above set out, and the agreement is signed upon printed lines, for the signature appearing about the middle of page 2. Upon the third page, which, as stated, is formed merely by folding over in book form a single sheet of paper upon which the first two pages appear, there is a specification of the articles ordered, together with the prices of each. These items appear in a column headed: “Complete list of articles covered by attached contract; Catalogue Price List; Net Selling Price.” The total of the sums charged for the respective articles is $1,775, corresponding to the amount called for by the body of the contract.
The items over which the dispute arises were furnished under the following paragraphs which appear upon this third page directly under the enumeration of the articles purchased:
“The company will furnish an experienced ice machine and creamery erecting engineer to install the above machinery and to overhaul and rebuild the complete creamery equipment, using as much of the old equipment as is possible, at the rate of $6.00 (six dollars) per day with traveling and living expenses extra.
“The company will furnish such new materials and apparatus as are necessary to complete the plant and not specified above on the basis of cost plus 10% (ten per cent).
“The company will furnish plans and specifications for the purchaser to work from in building cold storage room.”
[708]
More from California Court of Appeal
- People v. Hill (1998)
- In Re Autumn H. (1994)
- Nwosu v. Uba (2004)
- In Re Casey D. (1999)
- Santisas v. Goodin (1998)
- Cahill v. San Diego Gas & Electric Co. (2011)
- People v. Rivera (2015)
- People v. Barnett (1998)
- People v. Serrano (2012)
- Benach v. County of Los Angeles (2007)