MacHinery & Electrical Co. v. Young Men's Christian Ass'n
Before: James
Synopsis
APPEAL from a judgment of the Superior Court of Los Angeles County and from an order refusing a new trial. M. T. Dooling, Judge presiding.
The facts are stated in the opinion of the court.
Williams, Goudge & Chandler, and Edgar F. Hughes, for Appellant.
JAMES, J.
Plaintiff sued to recover on a contract under which one Hugh T. Duff, its assignor, agreed to furnish and install certain machinery and apparatus to constitute the engine-room equipment of the building of defendant. The contract provided for the payment of the total sum of twenty thousand dollars, which was to be made in various installments, the final payment of five thousand dollars to be paid thirty-six days after the completion of the work. It was alleged that there remained unpaid at the time suit was brought the sum of $1,433.66. The judgment of the court was in accordance with the prayer of plaintiff’s complaint, except that a deduction of the sum of $241.85 was made to cover material furnished by the defendant' to plaintiff, which was used in the prosecution of the work. Defendant in its answer referred to the written contract under which the engine-room equipment was agreed to be furnished and the work performed, and set out as an exhibit attached to its answer the complete text of such contract. It further alleged that plaintiff had failed to complete its contract and specified a number of particulars in which it was alleged there had been failure of completion. It was then alleged that the cost of the work and materials necessary to complete the contract and correct the defects and omissions was the sum of one thousand five hundred dollars. A motion for a new trial was made and denied, and an appeal was then taken from the order denying that motion and from the judgment.
It appeared from the evidence that plaintiff’s assignor set the engine-room plant in operation one month prior to the first of October, 1908, and operated the same, as required by his contract, for a period of one month, when the engineer of defendant took charge and the plant had ever since thereafter
[418]
been operated by and under the direction of defendant. The final payment not being made within the time fixed by the contract, demand was made therefor and a series of letters passed between Duff and defendant, in which defendant on its part made question as to the completeness of the work, and finally through its building committee informed Duff that if he would secure the certificate of its architect that payment would be made in accordance with the terms of the contract. Prior to the time that the engine plant was taken out of the hands of Duff by defendant, one Scattergood, the constructing engineer, had called the attention of Duff to a number of alleged defects and imperfections, some at least of which appear to have been remedied. After the plant had been turned over to defendant, and Duff had failed to secure payment of the full amount agreed to be paid under the contract, a further specification of imperfections was submitted to him by Scattergood and later by the architect, some of the items of which were in addition to those theretofore mentioned by Scattergood. Without any dispute it appeared that the live-steam fittings and valves were not installed in accordance with the specifications. The specifications required that these valves and fittings should be “extra heavy,” and the kind installed was what was known to the trade as “standard.” The testimony showed that the extra heavy fittings would withstand a greater pressure than the standard ones, and the latter were of less value than the former. A witness for the plaintiff, being the mechanic who had looked over the plant with defendant’s engineer, admitted that the terms “extra heavy” and “standard” were well known and understood by persons engaged / in his line of business. It further appeared without dispute j that an engine cylinder showed a crack some time after it j was installed and this crack was acknowledged by all parties
More from California Court of Appeal
- People v. Hill (1998)
- In Re Autumn H. (1994)
- Nwosu v. Uba (2004)
- In Re Casey D. (1999)
- Santisas v. Goodin (1998)
- Cahill v. San Diego Gas & Electric Co. (2011)
- People v. Rivera (2015)
- People v. Barnett (1998)
- People v. Serrano (2012)
- Benach v. County of Los Angeles (2007)