particular activity is not a project under the California Environmental Quality Act
(CEQA); and (2) that, if it were a project, then it was exempt from CEQA. The activity
at issue involved removing a conservation designation from one parcel of land, and
placing the designation on two other parcels of land. The trial court found Paulek had
standing and the moving of the conservation designation qualified as a “project” under
CEQA. The trial court denied the writ petition because it found the project fell within a
CEQA exemption. Paulek contends (1) he has standing; (2) the moving of the
restrictions is a CEQA project; and (3) the project does not fall within the identified
CEQA exemptions. We reverse the judgment.
FACTUAL AND PROCEDURAL HISTORY
A. MULTIPLE SPECIES HABITAT CONSERVATION PLAN
The Multiple Species Habitat Conservation Plan (MSHCP) is a plan to maintain
open spaces in the western portion of Riverside County (the County). The goal of the
MSHCP is to maintain biological diversity in open space areas, while allowing future
2
economic growth. The MSHCP caused conservation areas to be created in the western
portion of the County. The conservation areas totalled 500,000 acres of land. The
500,000 acres included 347,000 acres of existing public or quasi-public lands and
approximately 153,000 acres of “Additional Reserve Land.”
The 153,000 acres needed to be acquired at the time the MSHCP was created in
2003. The exact locations of the 153,000 acres were not identified in the MSHCP.
Instead, the MSHCP identified a “criteria area” that was “significantly larger” than
153,000 acres; the criteria area was approximately 340,000 acres. The criteria area was
broken into cells. Each cell was approximately 160 acres in size. The cells were to be
evaluated to determine what portions of the criteria area to include in the conservation
area.
The MSHCP provided “criteria” about the different cells. The “criteria” included
information about (1) the features of the land in the cell; (2) the particular species that
could be conserved on the land in the cell; (3) how the land in the cell was configured;
and (4) the geographic location of the cell.
The MSHCP accounted for the possibility that the criteria information for the
cells could change. Examples of possible changes included: (1) new biological
information could be discovered, (2) updated land use information could be obtained,
e.g. development information, and (3) new topographic or engineering information
could be discovered. Changing the criteria information in the MSHCP required a
procedure known as the “Criteria Refinement Process.” The Criteria Refinement
3
Process required written notification, inclusion on the Agency’s agenda, and a 60-day
review and response period.
If, as a result of the criteria changing, the land (cell) would no longer be part of
the criteria area, then (1) the MSHCP must be amended, or (2) other property must be
acquired to replace the land that would be lost. The replacement land must be
biologically equivalent or superior to the land that was being lost. The equivalent or
superior land determination was made through a process known as an “equivalency
analysis.” If the result of the equivalency analysis was that the replacement land was
biologically equivalent or superior then that change was an “acceptable refinement[] to
the MSHCP.” If the replacement land was found to not be biologically equivalent or
superior, then that would be an “unacceptable deviation[] from the MSHCP Criteria and
an amendment to the MSHCP would be required prior to approval.” The Agency was
responsible for carrying out the MSHCP’s requirements. The Agency was a joint
powers authority. (Gov. Code, §§ 6500-6536.)
B. EMINENT DOMAIN CASE
Real party in interest and respondent Anheuser-Bush, LLC (Anheuser) owned a
964.21-acre parcel known as the Warm Springs Ranch (the Ranch). The Ranch was
located in an unincorporated area of the County, immediately northeast of the City of
Murrieta. The Ranch was “largely surrounded by existing or approved [suburban]
development.” The Ranch was part of the MSHCP criteria area. There were six
MSHCP “cells” on the Ranch.
4
In 2002, the County informed Anheuser that development would be prohibited
on the Ranch because the Ranch would be part of the conservation area. In other words,
a conservation overlay had been placed upon the Ranch. The MSHCP was approved in
June 2003. In October 2003, the County changed the zoning for the Ranch from
“ ‘Rural’ and ‘Future Urban’ ” to “ ‘Rural Residential.’ ” This meant the development
possibilities changed from (a) 2.5 to 3.0 dwelling units for every acre to (b) one
dwelling unit for every five acres.
In order to develop land within the MSHCP criteria area, i.e., land subject to a
conservation overlay, the property owner must go through the Habitat Evaluation and
Acquisition Negotiation Strategy (HANS) process. Under the HANS process, to
develop the Ranch property, Anheuser would need to submit an application for the
proposed development project. An initial review would examine whether all or part of
the property was needed for the MSHCP conservation area. If the initial review
reflected all or part of the property was needed for the conservation area, then the
parties begin negotiating for conveyance of all or part of the property.1 If it is
determined that the property is not needed for the conservation area, “then the proposed
project may proceed through the normal project planning and design process.”
In December 2005, Anheuser submitted applications to develop the Ranch.
Anheuser submitted a general plan amendment, an application for a zoning change, and
1 We take judicial notice of the first 10 pages of section 6 of the MSHCP, because the record on appeal includes only pieces of the section. (Evid. Code, § 452, subd. (c); City of Sacramento v. State Water Resources Control Bd. (1992) 2 Cal.App.4th 960, 972, fn. 6 [taking judicial notice of a regional board’s minutes].)
5
a specific plan for the Ranch, which contemplated residential development. In February
2007, presumably after conducting the HANS process, the County informed Anheuser
that all but 71 acres of the Ranch would be acquired for conservation under the
MSHCP.
The County, the Agency, and Anheuser negotiated. They discussed the
possibility of a “land swap.” In the land swap, the County/Agency would (1) acquire a
portion of the Ranch, (2) provide “MSHCP clearance” for the remainder of the Ranch
that Anheuser continued to own, and (3) convey other County land to Anheuser for
Anheuser to develop. “[T]hird parties” objected to the land swap and the County and
Agency “walked away” from the land swap negotiations.
In 2009, the County sued Anheuser in eminent domain. The County sought to
take a portion of the Ranch in order to widen and extend Clinton Keith Road. Anheuser
filed a cross-complaint for inverse condemnation. The Agency was not named as a
party in the complaint or cross-complaint.
In 2011, Anheuser and the County reached a settlement. The Agency was also a
party to the “Settlement Agreement.” It appears the Agency became involved because
Anheuser alleged the application of the MSHCP criteria constituted a taking. In the
Settlement Agreement, Anheuser, the County, and the Agency agreed (1) to dismiss
their lawsuits, and (2) the Agency would purchase the Ranch from Anheuser. The
Agency and Anheuser, but not the County, executed a separate “Purchase and Sale
Agreement” regarding the Agency’s purchase of the Ranch.
6
The Purchase and Sale Agreement reflected the Agency planned to purchase the
Ranch in nine different phases. For example, phase 1 consisted of 250.18 acres and
would cost $10,000,000, while phase 2 consisted of 73.41 acres and would cost
$3,000,000. The different phases would be purchased over a period of eight years. The
phases were scheduled to be purchased each year, in succession. So, phase 1 would be
purchased immediately, in January 2012; then the phase 2 purchase would be completed
by the first anniversary of the phase 1 purchase, in January 2013; the phase 3 purchase
would be completed by the second anniversary of the phase 1 purchase, in January
2014; and so forth. The phase 9 purchase would be the final purchase, by the eighth
anniversary of the phase 1 purchase, in January 2020. The phase 9 property is a 200-
acre area and will cost $11,000,000.
The phase 9 property had conditions as part of the Purchase and Sale Agreement:
The Agency was to use its best efforts to complete a “criteria refinement” process for
the phase 9 property before March 2012, which would eliminate the cells on the phase 9
property, cause it to no longer be described as conservation land, and would relieve the
land from being subject to the HANS process. The Agency also agreed to make the
phase 9 property a separate legal parcel.
In order to remove the MSHCP conservation overlay from the phase 9 property,
the Agency had to (1) amend the MSHCP, or (2) refine the MSHCP by replacing the
lost land with biologically equivalent or superior replacement land. The removal of the
MSHCP conservation overlay would permit development to possibly occur in the future
on the 200-acre phase 9 site, if the Agency failed to make the $11,000,000 purchase.
7
The Agency explained that, if it failed to make the purchase, then the phase 9 property
would likely be developed into a university or used for residential and retail purposes.
Since the MSHCP conservation overlay would be removed from the phase 9
property, the Agency considered replacing the 200-acre phase 9 site with two sites that
aggregated to 1,064 acres. The first site was the Reynolds property, which consisted of
606 acres (Reynolds property). The second site was the Winchester-Tule Peak property,
which totaled 458 acres (Peak property). In conducting the equivalency analysis,
biologists found portions of the Ranch burned in a 2011 wildfire, the Ranch had manure
spread on it, many of the plants on the Ranch were not native species, and people
trespassed on the Ranch with dirt bikes. However, biologists also found (1) there were
species on the phase 9 property, such as the California Horned Lark and the Southern
California Rufous-crowned Sparrow, that were not present on the two proposed
replacement properties; and (2) future development on the phase 9 property could
disturb a neighboring conservation area.
In regard to the Reynolds property, biologists found it was primarily Coastal
Sage Scrub. The Peak property was predominately Chaparral. The Reynolds and Peak
properties were better for species such as the Gnatcatcher and Quino Checkerspot
Butterfly, than the phase 9 property.
On February 6, 2012, the Agency held a public hearing to consider the criteria
refinement, i.e., whether the MSHCP conservation overlay should be removed from the
phase 9 property and placed upon the Reynolds and Peak properties. Paulek spoke at
the meeting. Paulek asserted the Agency erred by proposing to exempt the MSHCP
8
conservation overlay swap from CEQA review. Paulek contended that by removing the
MSHCP conservation overlay, the Agency was creating the possibility that the site
could be developed into a university or residential and retail area, which would
adversely impact the neighboring conservation area. Paulek requested the Agency
consider how removal of the MSHCP conservation overlay would impact the
environment when combined with the potential for future development on the phase 9
site and the extension of Clinton Keith Road.
Paulek’s attorney also spoke at the meeting. Paulek’s attorney questioned why
the Agency would be purchasing land and removing the conservation overlay, since the
Agency was created to conserve land. Paulek’s attorney also questioned whether the
change in the conservation overlay related to litigation with Anheuser because it was
unclear from reading the Agency’s report whether litigation was somehow involved.
The Agency’s attorney said the phase 9 purchase and removal of the
conservation overlay were related to a settlement with Anheuser. An employee of the
company that created the Agency’s criteria refinement report explained the phase 9
property “could be conserved or developed.” An Agency board member asked,
“Where’s the analysis that shows that we have a high probability that we will have the
money to buy [the phase 9 property]?” The Agency’s attorney responded that the
criteria refinement had to be completed as part of the settlement with Anheuser.
On February 6, 2012, the Agency passed a resolution refining the criteria for the
phase 9 property, i.e., removing the conservation overlay. The resolution was
Resolution 12-002. The resolution reflected the criteria refinement (1) was not a project
9
(Cal. Code Regs., tit. 14, § 15378); (2) was a project, but was exempt because it assured
the maintenance or enhancement of a natural resource (Class 7 exemption) (Cal. Code
Regs., tit. 14, § 15307); and (3) was a project, but was exempt because it assured the
maintenance or enhancement of the environment (Class 8 exemption) (Cal. Code Regs.,
tit. 14, § 15308).
Paulek filed a petition for writ of mandate and complaint for injunctive relief
against the Agency, with Anheuser listed as the real party in interest. Paulek requested
(1) a writ of mandate directing the Agency to vacate and set aside its approval of the
criteria refinement; (2) alternative and peremptory writs of mandate directing the
Agency to comply with CEQA; and (3) a stay and injunction preventing the Agency and
Anheuser from implementing the criteria refinement until CEQA requirements had been
met. Paulek asserted the criteria refinement, i.e., removal of the conservation overlay,
was a “project” within the meaning of CEQA and that the project did not fall within the
Class 7 and Class 8 CEQA exemptions that were identified in the Agency’s resolution.
The Agency demurred to Paulek’s petition and complaint. Anheuser joined in
the demurrer. In the demurrer, the Agency asserted (1) Paulek lacked standing, and
(2) Paulek failed to join a necessary and indispensible party. In order for a person to
have standing in a CEQA lawsuit, the person must first have objected to the project
prior to the public hearing period closing. (Pub. Res. Code, § 21177, subd. (a).)2
2 All subsequent statutory references will be to the Public Resources Code unless otherwise indicated.
10
In the demurrer, the Agency asserted Paulek’s lawsuit was brought in his
individual capacity, while his comments during the public hearing period were brought
in his capacity as the conservation chair for the Friends of the Northern San Jacinto
Valley (the Friends). The Agency asserted Paulek’s attorney’s comments during the
public comment period were also brought on behalf of the Friends. The Agency argued
Paulek lacked standing to bring the lawsuit in his individual capacity because, during
the public comment period, he did not object as an individual.
The Agency also asserted Paulek’s lawsuit was deficient because he failed to
include the County as a defendant. The Agency asserted the County was a necessary
and indispensible party because vacating the approval of the criteria refinement would
affect the County’s Settlement Agreement with Anheuser. The Agency asserted the
standing and joinder issues could not be remedied because the statute of limitations for
amending the complaint and petition had passed. Therefore, the Agency contended the
demurrer must be sustained.
Paulek opposed the demurrer. Paulek asserted there was no legal authority for
the proposition that he ceased to be an individual due to his membership in an
organization for purposes of standing under section 21177. Paulek contended the
County was not a necessary or indispensible party because the County was not a
signatory to the Purchase and Sale Agreement in which the Agency agreed to purchase
the phase 9 property and remove the MSHCP restrictions. Paulek argued there was
nothing indicating the Settlement Agreement would be affected by temporarily halting
11
implementation of the criteria refinement during a CEQA compliance period. The trial
court overruled the demurrer.
The Agency and Anheuser filed answers to Paulek’s petition and complaint.
Paulek filed an opening brief in the trial court. First, Paulek contended the Agency
erred by combining two procedural steps. Paulek explained that the Agency was
required to determine if the removal of MSHCP restrictions would impact the
environment, and then, if it did not have an impact, a CEQA exemption would apply,
but it if did have an impact, mitigation measures must be considered. Paulek asserted
the Agency erred by combining these steps. Paulek asserted the Agency incorrectly
determined the removal of MSHCP conservation overlay would not have impact on the
environment due to the mitigation measures. In other words, Paulek asserted the
Agency should have considered whether removing the MSHCP conservation overlay
from the phase 9 property would have an environmental impact, without consideration
to any mitigation involving the Reynolds and Peak properties.
Second, Paulek contended possible development on the phase 9 property had the
potential to affect wildlife by reducing habitat. Paulek explained there were
endangered, rare, and threatened species on the phase 9 property and future
development of the site could impact those species.
The Agency filed points and authorities in opposition to Paulek’s opening brief.
First, the Agency asserted Paulek’s petition was time barred because Paulek was
challenging the Settlement Agreement from the Anheuser lawsuit, and the time to
challenge the Settlement Agreement passed. Second, the Agency asserted Paulek’s
12
petition failed because he did not join a necessary and indispensible party—the County.
The Agency asserted the County was a necessary and indispensible party because
Paulek was challenging the Settlement Agreement. Third, the Agency asserted Paulek
lacked standing because, during the public comment period, Paulek did not object in his
capacity as an individual.
The Agency asserted the February 2012 criteria refinement “was merely [the
Agency’s] implementation of one of the terms of the Settlement Agreement.” In
connection with this argument, the Agency faulted Paulek’s assertion that the Agency
had authorized development of the phase 9 property. The Agency asserted the criteria
refinement did not approve development of the phase 9 property.
Fourth, the Agency asserted it did not combine procedural steps when analyzing
the potential for an environmental impact. The Agency explained that the Criteria
Refinement Process requires an exchange of land, so the moving of the MSHCP
conservation overlay from the phase 9 property to the Reynolds and Peak properties was
not mitigation; rather, it was the project. The Agency asserted that if the land exchange
were deemed mitigation, then it was unclear what the “project” would be.
Fifth, the Agency asserted criteria refinement was not a project under CEQA.
The Agency contended the purpose of the criteria refinement was to protect 1,064 acres
of land. Since 1,064 acres would be protected as open space, CEQA does not apply.
The Agency asserted the phase 9 property was “highly disturbed and represents [a]
degraded habitat.” Therefore, the Agency reasoned, the action would result in more and
better land being protected, so the action was not a CEQA “project.”
13
Anheuser also filed an opposition. Anheuser joined in the Agency’s arguments.
Anheuser also asserted Paulek’s petition was untimely because Paulek was challenging
the Settlement Agreement, and the time to challenge that agreement had passed prior to
Paulek filing his petition and complaint. Anheuser also asserted Paulek’s petition and
complaint failed because he did not join a necessary and indispensible party, i.e., the
County.
Paulek filed a reply. First, Paulek asserted the County was not a necessary and
indispensible party because the Settlement Agreement was not the subject of Paulek’s
litigation. Paulek asserted the subject of the litigation was the criteria refinement, i.e.,
the Agency’s resolution and CEQA “Notice of Exemption,” neither of which was issued
by the County. Paulek also noted that, as part of the demurrer, the trial court already
found the County was not a necessary or indispensible party.
Second, Paulek contended he had standing to sue. Paulek noted the standing
issue had already been decided as part of the demurrer. Paulek asserted he had standing
because there was no legal authority for the theory that Paulek’s act of mentioning his
membership in the Friends stripped him of his status as an individual when commenting
on the criteria refinement.
Third, Paulek asserted the Agency made procedural errors. Paulek contended the
Agency erred by finding the criteria refinement was not a project under CEQA, and then
finding the activities were a project under CEQA, but that the project was exempt for
two different reasons. Paulek asserted the law required the Agency to select one reason,
rather than three reasons, why CEQA did not apply.
14
Fourth, Paulek asserted the evidence reflected development on the phase 9
property could affect the conservation area to the north of the phase 9 property because
development would create “a new urban edge.” Paulek contended the criteria
refinement could potentially have significant impacts on the environment and would
need to be reviewed through a mitigated negative declaration or an environmental
impact report.
The trial court issued a written ruling in the matter. First, the trial court found
Paulek did not fail to join an indispensible party because the County did not participate
in the February 6th public hearing and therefore could not be a “recipient of an
approval” that must be named as a party. (Former § 21167.6.5, subd. (a) [effective
2005].) Second, the trial court found Paulek had standing. The trial court explained it
was irrelevant whether Paulek spoke on his personal behalf or on behalf of the Friends
at the February 6th meeting because either way, Paulek spoke at the meeting.
Third, the trial court found Paulek’s petition was not time-barred. The trial court
found the project at issue was the February 6th criteria refinement, i.e., the Agency’s
resolution, as opposed to the earlier Settlement Agreement. Therefore, the petition was
not time-barred. The trial court explained that removing the MSHCP conservation
overlay from the phase 9 property “allows at least the potential for future development,
since the only thing that prevented any type of development on this land was the
MSHCP criteria.” The court found that removing the MSHCP conservation overlay
“amounts to ‘a reasonably foreseeable indirect physical change in the environment’ on
15
those 200 acres of land.” Therefore, the trial court concluded the criteria refinement on
the phase 9 property constituted a CEQA project.
The trial court then considered CEQA exemptions, in particular the Class 7 and
Class 8 exemptions identified in the Agency’s resolution. The Class 7 exemption
exempts CEQA projects that “consist[] of actions taken by regulatory agencies . . . to
assure the maintenance, restoration, or enhancement of a natural resource where the
regulatory process involves procedures for protection of the environment. Examples
include but are not limited to wildlife preservation activities of the State Department of
Fish and Game. Construction activities are not included in this exemption.” (Cal. Code
Regs., tit. 14, § 15307, italics added.)
The Class 8 exemption exempts CEQA projects that “consist[] of actions taken
by regulatory agencies . . . to assure the maintenance, restoration, enhancement, or
protection of the environment where the regulatory process involves procedures for
protection of the environment. Construction activities and relaxation of standards
allowing environmental degradation are not included in this exemption.” (Cal. Code
Regs., tit. 14, § 15308, italics added.)
Class 7 exempts projects that maintain or protect “a natural resource,” while
Class 8 exempts projects that maintain or protect “the environment.”
The trial court found construction would not take place on the phase 9 property,
and that it appeared the property would be preserved. The trial court explained that the
MSHCP conservation overlay was only removed from the phase 9 property so that if the
16
Agency failed to purchase it, then the land would be “useful” to Anheuser. Thus, the
trial court found the Class 7 exemption applied in this case, i.e., CEQA did not apply.
The trial court then turned to whether an exception to the Class 7 exemption
applied, such that CEQA would apply to the project. The exception at issue provides an
exemption shall not be applied to “an activity where there is a reasonable possibility that
the activity will have a significant effect on the environment due to unusual
circumstances.” (Cal. Code Regs., tit. 14, § 15300.2, subd. (c).) The trial court found
the circumstances were not unusual because (1) there were few protected species on the
phase 9 property; and (2) the Agency has the authority to remove the MSHCP
conservation overlay from properties.
Next, the trial court considered whether CEQA applied because the project may
have a significant effect on the environment based upon the project having “the
potential to . . . threaten to eliminate a plant or animal community; [or] substantially
reduce the number or restrict the range of an endangered, rare or threatened species.”
(Cal. Code Regs., tit. 14, § 15065, subd. (a)(1).) The court found there was nothing
indicating a species would be harmed. The trial court denied Paulek’s petition and
entered judgment in favor of the Agency and Anheuser.
DISCUSSION
Paulek contends the trial court erred by denying his petition and entering
judgment in favor of the Agency and Anheuser.
17
A. STANDING
Paulek asserts he has standing. During the public comment period, when Paulek
spoke, he introduced himself and identified himself as the conservation chair for the
Friends. Paulek also submitted a letter, on plain paper, without letterhead, wherein the
signature block reflected Paulek was the Friends’s conservation chair. So the question
presented is whether Paulek lost his standing as an individual by identifying himself as
the Friends’s conservation chair.
Since the facts are undisputed, we review the issue do novo. (Scott v. Thompson
(2010) 184 Cal.App.4th 1506, 1510.) The “standing” provision for CEQA concerns
administrative exhaustion. In order to have a standing to sue, a person must first have
exhausted his administrative remedies by raising his objections either orally or in
writing during the government agency’s public comment period. (§ 21177, subd. (a).)
Paulek has standing because he spoke at the public hearing and submitted a
letter. At the February 6th meeting, Paulek said, “I have two issues of, well, my name is
Tom Paulek. Uh I’m the conservation chair for the Friends[.] Long time resident of uh
Riverside County.” Paulek’s comments can be interpreted as him speaking in both
capacities—on his personal behalf, since he identified his personal residence status, and
in his capacity as an officer of the Friends, since he also identified himself in that
capacity. Given that Paulek identified himself in both capacities, and it would strain
government resources for people to have to repeat identical comments in different
capacities, we conclude Paulek has standing.
18
The Agency asserts Paulek only objected on behalf of the Friends. Therefore,
the Friends would have standing but Paulek does not. Organizations or associations
gain standing to sue when their members have standing to bring the case as individuals.
(Taxpayers for Accountable School Bond Spending v. San Diego Unified School District
(2013) 215 Cal.App.4th 1013, 1031; Monterey/Santa Cruz County Bldg. and Const.
does not apply if there is a fair argument that the criteria refinement may have a
significant effect on the environment—if there is a fair argument that the criteria
refinement is not assuring the maintenance, restoration, or enhancement of a natural
resource. (Banker’s Hill, supra, 139 Cal.App.4th at pp. 266-267.) As explained, ante,
we examine the record to determine if there is substantial evidence to support the
Agency’s application of the exemption. (Berkeley, supra, 60 Cal.4th at pp. 1115-
1116.)3
We will again assume the Agency’s view is correct in that the changes to the
phase 9, Reynolds, and Peak properties should be viewed together. On the phase 9
property, a variety of species have been sited, including the California Horned Lark and
the Southern California Rufous-crowned Sparrow. The California Horned Lark and the
Southern California Rufous-crowned Sparrow have not been sighted on the Reynolds
and Peak properties. However, the phase 9 property does have some species in common
with the Reynolds and Peak properties, such as bobcats, the Quino Checkerspot
Butterfly, the Coastal California Gnatcatcher, and Bell’s Sage Sparrow.
3 The Agency determined there was not a fair argument that there may be a significant effect on a natural resource. Accordingly, we are applying the substantial evidence standard to a negative finding. We must examine if there is substantial evidence that a fair argument does not exist.
29
The criteria refinement is a trade-off: some species may be maintained while
other species may not be maintained. As explained, ante, the evidence reflects at least
two species are on the phase 9 property that are not on the Reynolds and Peak
properties, in particular the California Horned Lark and the Southern California Rufous-
crowned Sparrow. There is evidence that the phase 9 property is not a “prime” habitat
site for the lark and sparrow; however, there is nothing reflecting that the phase 9
property is superfluous to the species such that there could be substantial evidence to
support a fair argument that there may be no significant impact to the species by
removing the conservation overlay from the property. In other words, the property may
not be “prime” or ideal, but that does not equate with “insignificant” or unneeded. As a
result, the evidence does not support the conclusion that there is not a fair argument
regarding a significant effect on a natural resource. Therefore, we conclude substantial
evidence does not support the application of the Class 7 exemption.
4. CLASS 8 EXEMPTION
We now turn to the Class 8 exemption. The Class 8 exemption exempts CEQA
projects that “consist[] of actions taken by regulatory agencies . . . to assure the
maintenance, restoration, enhancement, or protection of the environment.” (Cal. Code
Regs., tit. 14, § 15308.) “ ‘Environment’ means the physical conditions which exist
within the area which will be affected by a proposed project, including land, air, water,
minerals, flora, fauna, noise, objects of historic or aesthetic significance.” (§ 21060.5.)
As explained, ante, the categorical exemption does not apply if there is a fair
argument that the criteria refinement may have a significant effect on the
30
environment—if there is a fair argument that the criteria refinement is not assuring the
maintenance, restoration, or enhancement of the environment. (Banker’s Hill, supra,
139 Cal.App.4th at pp. 266-267.) We determine if the Agency’s decision is supported
by substantial evidence. (Berkeley, supra, 60 Cal.4th at pp. 1115-1116.)
Again, the criteria refinement is a trade-off. The Reynolds and Peak properties
may be protected, but the phase 9 property has lost its protected status. The
environment may be significantly affected by this trade because the evidence reflects
some species are on the phase 9 property, but not on the Reynolds and Peak properties.
Additionally, the evidence reflects the neighboring conservation area to the north of the
phase 9 property could be disturbed by future development on the phase 9 property. In
particular, the evidence reflects, “The new urban edge that will be created by the 200-
acre [phase 9] site could affect the Conservation Areas currently existing to the north of
the site within Cells 5163 and 5165.” Further, “The 200-acre development area has
been focused on the very northern part of the Warm Springs [Ranch] Property, in an
attempt to lessen edge effects . . . .”
Thus, the evidence provides that the loss of the conservation overlay may affect
the neighboring conservation area, and the effects may be significant such that there
would need to be an attempt to lessen the effects. This evidence shows an uncertainty
about whether there will be a significant impact on the environment. Given the
evidence, there is not substantial evidence supporting the finding that a fair argument
has not been made that there may be a significant effect on the environment. Therefore,
the categorical Class 8 exemption does not apply.
31
5. AGENCY’S AND ANHEUSER’S CONTENTIONS
The Agency contends the Class 7 and Class 8 exemptions apply because the
evidence reflects the Reynolds and Peak properties are biologically equivalent or
superior to the phase 9 property. The Agency’s argument fails to explain how it is
known that there will not be a significant impact to the environment or a natural
resource, when there are species on the phase 9 property that are not on the Reynolds
and Peak properties, and when the neighboring conservation area could be affected. We
are not concluding that there will be an impact, we are only concluding that there may
be an impact, and therefore substantial evidence does not support application of a
categorical exemption because the evidence does not refute a fair argument that there
may be a significant effect on the environment.
Next, the Agency contends the Class 7 and Class 8 exemptions do not apply
because the criteria refinement will result in 1,064 acres being preserved. The Agency
is again ignoring the phase 9 property. The Agency is focusing on the Reynolds and
Peak properties as though the only action the Agency is taking is adding the
conservation overlay to those properties. The Agency is ignoring the other piece of the
equation, which is removing the conservation overlay from the phase 9 property.
This court has explained in a prior case, “[A] new regulation that strengthens
some environmental requirements may not be entitled to an exemption if the new
requirements could result in other potentially significant effects.’ ” (California Unions
for Reliable Energy v. Mojave Desert Air Quality Management Dist. (2009) 178
projects designated pursuant to Section 21084.” Section 21084, subdivision (a),
includes “classes of projects that have been determined not to have a significant effect
on the environment.”
Thus, lawsuits should be directed at an agency’s determination that a project will
not have a significant effect on the environment. In this case, that determination was
the passing, approval, and adoption of the resolution, wherein the Agency’s Board of
Directors found the criteria refinement was not a project, and that if it were a project,
then the project was exempt under Classes 7 and 8. Since the lawsuit was properly
directed at the resolution, and the resolution does not include the common sense
exemption, we conclude Paulek did not forfeit the issue by not raising it in his petition
and complaint.
The Agency raised the common sense exemption in its trial court opposition
points and authorities; however it melded the common sense argument with its
argument related to the criteria refinement not being a project. In Paulek’s reply at the
trial court, he faulted the Agency for raising the common sense exemption. Paulek
asserted (1) the Agency had the responsibility to select one reason the criteria
refinement did not require CEQA review, therefore the Agency erred by citing multiple
reasons; and (2) substantial evidence does not support the application of the common
sense exemption. Accordingly, when the common sense exemption was raised as an
39
issue in the lawsuit, Paulek addressed it. As a result, we conclude Paulek did not forfeit
the issue.
4. MERITS
Although we have explained, ante, that the common sense exemption was not
included in the resolution, and thus not included in Paulek’s lawsuit, we will
nevertheless address the merits of the issue for the sake of thoroughness.
As set forth, ante, the exemption applies “[w]here it can be seen with certainty
that there is no possibility that the activity in question may have a significant effect on
the environment.” (Cal. Code Regs., tit. 14, § 15061, subd. (b)(3).) Under this
exemption, a plaintiff “need only make a ‘slight’ showing of a reasonable possibility of
a significant environmental impact. [Citation.] It is the lead agency that has the burden
of establishing the common sense exemption, i.e., that there is no possibility the project
may cause significant environmental impacts.” (California Farm Bureau Federation v.
California Wildlife Conservation Bd. (2006) 143 Cal.App.4th 173, 195.) We apply the
abuse of discretion standard, which requires us to review the record to determine if the
Agency’s decision is supported by substantial evidence. (Creed-21 v. City of San
Diego, supra, 234 Cal.App.4th at pp. 511-512.)
The Agency’s equivalency report reflects there are species on the phase 9
property that are not on the Reynolds and Peak properties. The report also reflects,
“The new urban edge that will be created by the 200-acre [phase 9] site could affect the
Conservation Areas currently existing to the north of the site within Cells 5163 and
5165.” The report reflects that “The 200-acre development area has been focused on
40
the very northern part of the Warm Springs Property, in an attempt to lessen edge
effects . . . .”
Substantial evidence does not reflect there is no possibility the activity may have
a significant effect on the environment. Rather, the evidence reflects there could be an
effect on the northern conservation areas, and while attempts can be made to lessen the
effects, it cannot be concluded there is no possibility that there will be no effects from
the decision to remove the MSHCP conservation overlay from the phase 9 property. As
a result, we conclude substantial evidence does not support application of the common
sense exemption.
The Agency contends the common sense exemption is applicable because
development is not planned on the phase 9 property. As set forth, ante, it cannot
currently be known if the phase 9 property will be preserved or developed. However,
also explained, ante, the Agency has made a change in the protected land status of the
phase 9 property, from being protected to being unprotected. This change in
designation embodies a fundamental land use decision that has the potential for causing
ultimate physical changes in the environment. (See Black, supra, 22 Cal.App.4th at
p. 985; Muzzy, supra, 41 Cal.4th at p. 385.)
F. STATUTE OF LIMITATIONS
The Agency contends Paulek’s petition and complaint are time-barred because
Paulek exceeded the statute of limitations. Specifically, the Agency asserts Paulek is
challenging the Settlement Agreement, and he filed his lawsuit too late to challenge that
agreement.
41
There is a 35-day statute of limitations for challenging a public agency’s
determination that a project will not have a significant effect on the environment and is
exempt from CEQA. (§ 21167, subd. (d).) In Paulek’s lawsuit, he is attacking the
Agency’s determinations that (1) the criteria refinement is not a project; (2) the Class 7
exemption applies; and (3) the Class 8 exemption applies. These determinations were
made on February 6, 2012, when the Agency passed, approved, and adopted the
resolution pertaining to the criteria refinement. Paulek’s lawsuit was filed on March 8,
2012. March 8th is less than 35 days after February 6th. Accordingly, we conclude
Paulek’s lawsuit is timely; he did not exceed the statute of limitations.
The Agency contends the statute of limitations was exceeded because Paulek’s
arguments regarding the resolution are fundamentally challenging the Settlement
Agreement because the criteria refinement is a term in the Settlement Agreement. To
the extent the Agency is arguing it contracted away its procedural requirements in the
Settlement Agreement by guaranteeing to pass the criteria refinement without CEQA
review, such an argument would fail because it is impermissible for an agency to
circumvent its procedural requirements via contract. (Trancas Property Owners
Association v. City of Malibu (2006) 138 Cal.App.4th 172, 182-183.)
To the extent the Agency is arguing Paulek’s lawsuit is challenging the
Settlement Agreement, that argument also fails. Paulek is challenging the procedure by
which the Agency is complying with the Settlement Agreement. The Agency
determined it could go forward with the criteria refinement without a CEQA review.
Paulek asserts CEQA review is required. For example, a CEQA review may reveal that
42
the Reynolds and Peak properties are not the best mitigation lands. It may be that the
criteria refinement goes forward, but an environmental analysis finds other lands will
serve to better mitigate the possible loss of the phase 9 property. Thus, Paulek is not
asserting the criteria refinement cannot happen; rather, he is asserting the Agency must
follow the proper procedures in conducting the criteria refinement. Therefore, Paulek is
not challenging the Settlement Agreement because Paulek is not asserting the Agency is
barred from conducting the criteria refinement; rather, he is asserting the proper
procedures need to be followed in refining the criteria.
G. JOINDER
The Agency and Anheuser (collectively, defendants) contend Paulek’s petition
and complaint fail because Paulek did not join the County, and the County is a
necessary and indispensible party. Defendants assert Paulek is attacking the Settlement
Agreement, and since the County is a signatory to the Settlement Agreement, the
County is a necessary and indispensible party in this lawsuit.
Code of Civil Procedure section 389 typically governs a discussion regarding
necessary and indispensible parties. However, in a CEQA action, Public Resources
Code section 21167.6.5 supplants Code of Civil Procedure section 389 for the
“necessary” factor. (In re Quantification Settlement Agreement Cases (2011) 201
Cal.App.4th 758, 855.) “If an entity is a recipient of an approval for purposes of [Public
Resources Code] section 21167.6.5(a), that entity is a necessary party in a CEQA action
challenging the [environmental impact report] for the project that was approved, and no
43
further showing need be made under subdivision (a) of Code of Civil Procedure section
389 to make that entity a necessary party.” (Id. at p. 855.)
“ ‘Approval’ means the decision by a public agency which commits the agency
to a definite course of action in regard to a project intended to be carried out by any
person. . . . Legislative action in regard to a project often constitutes approval.” (Cal.
Code Regs., tit. 14, § 15352.) “Recipient” is not defined in the Code, so we apply its
ordinary meaning—a person who receives or acquires. (Webster’s 9th New Collegiate
Dict. (1991) p. 983, col. 1.) Thus, “recipient of approval” means one who receives a
decision committing an agency to a definite course of action regarding a project.
The County signed the Settlement Agreement with Anheuser, settling their
litigation. The signatories to the Settlement Agreement were the County, the Agency,
and Anheuser. The Settlement Agreement reflected that the releases in the Settlement
Agreement will have no force or effect unless the Agency “has completed its
obligations under Section 19(b) of the [Purchase and Sale Agreement], and this has
resulted in (a) the elimination of the Cells on the phase 9 Property such that the phase 9
Property will no longer be subject to the HANS process and (b) development of the
phase 9 Property is no longer conditioned or restricted by the MSHCP Cells and will not
be described for Conservation.”
The Agency and Anheuser were signatories to the Purchase and Sale Agreement.
The County was not a signatory to the Purchase and Sale Agreement. Section 19(b) of
the Purchase and Sale Agreement provides: The Agency “shall use its best efforts to
complete and take final action on a ‘criteria refinement’ process under the MSHCP for
44
the phase 9 Property on or before March 1, 2012. This process shall undertake the
elimination of the Cells on the phase 9 Property, the result of which is that the phase 9
Property will no longer be subject to the [HANS] process and will not be described for
Conservation.”
As explained, ante, Paulek’s lawsuit is challenging the process used by the
Agency in refining the criteria. Paulek is asserting the Agency improperly skipped the
CEQA process. Paulek is not contending the Settlement Agreement is wrong or that the
criteria refinement can never happen. Rather, Paulek is asserting the Agency must
follow the proper procedures. Thus, Paulek is not “undoing” the Settlement Agreement.
Rather, Paulek is attempting to “undo” the February 6th resolution, so the Agency can
employ the proper process when deciding the criteria refinement issue.
The County was not a “recipient” of the decision to not apply CEQA. The
resolution was passed by the Agency. Anheuser is the owner of the phase 9 property.
The Agency has an agreement to purchase the phase 9 property from Anheuser by
January 2020. The County did not receive the approval of the MSHCP criteria
refinement because the County is not a party to the decision, it is not the owner of the
property, and it is not the prospective owner of the property. As a result, the County is
not the recipient of an approval and is not a necessary party.
Since we have concluded the County is not a necessary party, we do not address
whether it is an indispensible party. (Citizen Assn. for Sensible Development of Bishop
Area v. County of Inyo (1985) 172 Cal.App.3d 151, 161-162 [Fourth Dist., Div. Two] [a
necessary party is not automatically an indispensible party].)
45
The Agency contends “the County is a ‘recipient of approval’ . . . because
without the Criteria Refinement the County may not rely on the Settlement Agreement.”
As explained, ante, Paulek is not asserting the County must go “without” the criteria
refinement. Rather, Paulek is asserting the Agency must follow the proper procedures
when deciding the criteria refinement issue. The process was implemented by the
Agency and affects property owned by Anheuser. The County is not a necessary party
to the issue of whether the proper procedures were followed. Accordingly, we find the
Agency’s argument to be unpersuasive.
To the extent the Agency is asserting the County is a necessary party because the
County’s Settlement Agreement guarantees the criteria refinement will be adopted
without CEQA review, such an argument fails. As explained, ante, the County could
not have contracted to guarantee the Agency’s criteria refinement resolution would pass
without CEQA review. (Trancas Property Owners Association v. City of Malibu,
supra, 138 Cal.App.4th at pp. 182-183.) As a result, nothing in the Settlement
Agreement is affected by CEQA procedures being implemented in the Criteria
Refinement Process. The lawsuit is not seeking to bar the criteria refinement, it is only
seeking to have the Agency follow the proper procedures in deciding the criteria
refinement issue.
H. CONCLUSION
The criteria refinement is a project. Substantial evidence does not support
application of the Class 7 and Class 8 exemptions relied upon in the resolution.
Therefore, if the Agency seeks to proceed with the criteria refinement, then the Agency
46
must move to the next step of the analysis and conduct an initial threshold study to see
if the criteria refinement will have a significant impact on the environment, in order to
determine whether a negative declaration may be issued. (See Committee to Save
Hollywoodland Specific Plan v. City of Los Angeles, supra, 161 Cal.App.4th at p. 1187.)
DISPOSITION
The judgment is reversed. The trial court is directed to grant Paulek’s petition
for a writ of mandamus and require the Western Riverside County Regional
Conservation Authority to (1) vacate and set aside its February 6, 2012, passing,
approval, and adoption of Resolution No. 12-002 certifying and approving the Warm
Springs Criteria Refinement; and (2) rescind the February 6, 2012, Notice of Exemption
concerning the MSHCP Criteria Refinement. Paulek is awarded his costs on appeal.
CERTIFIED FOR PUBLICATION
MILLER J.
We concur:
McKINSTER Acting P. J.
KING J.
47
AI Brief
AI-generated · verify before citing
Holding. The court held that the trial court erred in denying the petition for writ of mandate, concluding that the criteria refinement process—which removed conservation restrictions from a parcel of land—constituted a project under CEQA that was not exempt from environmental review.
Issues
Whether the petitioner had standing to challenge the agency's action under CEQA.
Whether the agency's criteria refinement process constituted a 'project' under CEQA.
Whether the agency's action fell within the Class 7 or Class 8 categorical exemptions from CEQA.
Disposition. reversed
Quotations verified verbatim against the opinion
“The trial court found Paulek had standing and the moving of the conservation designation qualified as a “project” under CEQA.”