Cusenza v. Construction Design & Consulting, Inc.
Before: Kingsley
Opinion
KINGSLEY, J.
Plaintiffs contracted with a firm of architects and a contracting firm for the construction of a building. The building was completed
[203]
and, on January 3, 1978, plaintiffs discovered serious defects therein. There arose a dispute as to whether the defects were the result of improper planning by the architects or were the result of improper work by the contractor. Plaintiffs had contracted with the architects and with the contractor in separate contracts both of which contain arbitration clauses. However, the arbitration clause in the architect contract expressly provided that any arbitration could be between the owners and the architects only and specifically barred a three-party arbitration except by express subsequent agreement. The contract with the contractor contained no such limiting provision. Plaintiff served a demand for arbitration on both the architect and the contractor jointly. The architect procured from the superior court a writ prohibiting a joint arbitration hearing. Although the writ was ordered issued, it was not served on the arbitrator for one and one-half years. Plaintiffs then asked the arbitrator to sever the hearings and to proceed first on the owner-architect arbitration. The arbitrator refused to sever, ruling that the writ prohibited him from taking any action at all unless and until one of the parties was dismissed. Plaintiffs made no attempt to challenge that ruling, but dismissed the arbitration as against the contractor. The owner-architect hearing then proceeded, resulting in an award in favor of the architect.
Faced with the possible running of the statute of limitations as between the owners and the contractor, plaintiffs filed the present action against the contractor, but withheld service of that complaint until after the award in favor of the architect had been entered, On service of this complaint, the contractor demurred, raising the issue that, under the contract, arbitration was a condition precedent to any civil action. The contractor expressly disavowed demanding arbitration. The demurrer was sustained, the civil action was dismissed and this appeal followed. We affirm.
In
Charles J. Rounds Co.
More from California Court of Appeal
- People v. Hill (1998)
- In Re Autumn H. (1994)
- Nwosu v. Uba (2004)
- In Re Casey D. (1999)
- Santisas v. Goodin (1998)
- Cahill v. San Diego Gas & Electric Co. (2011)
- People v. Rivera (2015)
- People v. Barnett (1998)
- People v. Serrano (2012)
- Benach v. County of Los Angeles (2007)